
Facility
35105 Cricklewood Boulevard “Crick 1”
New Baltimore, MI 48047
190,000 Square Feet
+48K ft2
Staff
- 277+ Total Employees
- Operational Management
- Tooling Maintenance
- Customer Service with EDI capability
- Planning and Logistics
- Manufacturing and Assembly
- Process Engineering and Development
- Purchasing
- Quality Engineering and Management
- Facilities Management
- Equipment Maintenance
- Shipping and Receiving
- Environmental Management
Equipment
- 45 Injection Molding Machines
- 85 – 3900 Tons
- Cranes – (3) 15 to 60 ton
- 10 Assembly Machines
- 12 Fork Trucks 2800 to 6000 lbs.
- Central Material Loading System
- 21 Granulators
- 2 Silos 70K ea.
- Central Water Tower System
- Chilled Water System
- 18 Truck Docks with Dock Levelers and Trailer Latches
- 8 Ground Level Truck Access Doors Points
- Box Truck
- Quality Inspection and Testing Lab