Facility

35105 Cricklewood Boulevard “Crick 1”
New Baltimore, MI 48047

190,000  Square Feet

+48K ft2

Staff
  • 277+    Total Employees
  • Operational Management
  • Tooling Maintenance
  • Customer Service with EDI capability
  • Planning and Logistics
  • Manufacturing and Assembly
  • Process Engineering and Development
  • Purchasing
  • Quality Engineering and Management
  • Facilities Management
  • Equipment Maintenance
  • Shipping and Receiving
  • Environmental Management
Equipment
  • 45 Injection Molding Machines
  • 85 – 3900 Tons
  • Cranes – (3) 15 to 60 ton
  • 10 Assembly Machines
  • 12 Fork Trucks     2800 to 6000 lbs.
  • Central Material Loading System
  • 21 Granulators
  • 2 Silos   70K ea.
  • Central Water Tower System
  • Chilled Water System
  • 18 Truck Docks with Dock Levelers and Trailer Latches
  • 8 Ground Level Truck Access Doors Points
  • Box Truck
  • Quality Inspection and Testing Lab